College of Tourism and Archeology – King Saud University
Riyadh · Industrial · 2007 - 2010
Scope
MEP Contracting – HVAC, Plumbing, Firefighting, Electrical, Maintenance
MEP installation works including HVAC, ductwork, chillers, air handling units, fire suppression systems, plumbing, and electrical works in the college building. The photos show large-diameter black steel pipes ready for installation, red main firefighting lines with hangers suspended from the concrete ceiling, electrical conduits and cable runs above the slab, and insulated HVAC ducts with their branches. The work was carried out using mobile scaffolding on open floors.
- Duration
- 40 months
- Location
- Riyadh