
Scope
HVAC ductwork, fire-fighting mains, cable tray and MEP first-fix across the retail hall
We executed the mechanical and electrical installation across the branch's steel-framed retail hall. Scope covered insulated supply ductwork with diffusers and take-offs, grooved-end fire-fighting mains and risers, perforated cable tray runs and hangers off the steel roof structure, alongside sanitary and drainage first-fix laid in the slab.
- Duration
- 5 months
- Location
- Riyadh
Gallery








