
Scope
Mechanical, electrical and plumbing installation works
We installed the palace air-conditioning and fire protection systems, including insulated rectangular ductwork, flexible drops and diffusers routed through the pitched insulated roof structure, plus air handling units set out under an external plant canopy. We also executed the fire pump room pipework with flanged valves, check valves and flexible connectors, along with the associated electrical conduit and containment.
- Duration
- 7 months
- Location
- Al-Kharj
Gallery










