Durit Rum Co. logo
Tamkeen Tower
← Back to projects

Tamkeen Tower

Riyadh · Industrial · 2016–2017

Scope

Mechanical, electrical and plumbing installation works

We executed the MEP installation across the tower's office floors, running red fire-fighting mains with sprinkler drops and smoke detectors, insulated supply ductwork with flexible connections and linear diffusers, and ceiling-mounted fan-coil units complete with chilled-water valve sets, copper coil connections and condensate drains. Our plumbing crews installed the soil, waste and water piping with solvent-welded fittings and clamped supports, alongside conduit, cable tray and floor distribution boards for the electrical services.

Duration
3 months
Location
Riyadh

Gallery

Tamkeen Tower — 1Tamkeen Tower — 2Tamkeen Tower — 3Tamkeen Tower — 4Tamkeen Tower — 5Tamkeen Tower — 6Tamkeen Tower — 7Tamkeen Tower — 8Tamkeen Tower — 9