Scope
Mechanical, electrical and plumbing installation works
We executed the mechanical, electrical and plumbing works for the campus, including the rooftop air-cooled chiller plant with in-line pumps, insulated chilled-water headers, butterfly and gate valves, strainers, gauges, and flanged connections. Internal works covered plant rooms with air-handling units and their insulated pipe and duct connections, insulated supply and return ductwork with cable containment, cast-iron soil and waste stacks with couplings and brackets, and fire-protection piping. This was complemented by the associated conduits, panels, and control wiring through to testing and commissioning.
- Duration
- 8 months
- Location
- Arar & Al-Jouf